APPLICANT |
Onward Engineering - For the City of Lomita ,
|
ADDRESS |
300 S Harbor Boulevard Suite 814
|
CITY |
ZIP |
TELEPHONE |
Anaheim
|
92805
|
7146448362
|
REQUEST PREPARED BY |
TELEPHONE |
Justin Smeets
|
(714) 644-8362
|
ALL WORK MUST BE DONE IN
ACCORDANCE WITH THE LATEST ADOPTED EDITION & SUPPLEMENTS OF THE STANDARD
SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, THE LATEST REVISION OF THE BROWN BOOK,
AND THE WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH MANUAL).
|
24817 Western Avenue
Los Angeles, CA 90717
|
The scope of work includes trenching and installation of 8" DR 14 PVC pipe along 246th St, 247th St, 247th Pl, 248th St, Lomita Blvd, and Western Ave (local street) within the jurisdiction of the City of Los Angeles only. Work will also include potholing, pavement restoration, and striping as necessary to restore the existing surface conditions.
|
Permit Cuts:
No. |
L x W x D |
On Street |
Cross Street |
SDRF Sq Ft |
SDRF Fee |
Surface |
Backfill |
18 |
315.00 (ft)
x 2.50 (ft)
x 4.00 (ft)
|
246TH |
WESTERN |
3,916.66 |
$32,273.30 |
Street Asphalt Concrete |
CMB |
23 |
298.00 (ft)
x 2.50 (ft)
x 4.00 (ft)
|
WESTERN |
246TH |
3,711.79 |
$30,585.16 |
Street Asphalt Concrete |
CMB |
26 |
308.00 (ft)
x 2.50 (ft)
x 4.00 (ft)
|
247TH |
WESTERN |
3,832.30 |
$31,578.18 |
Street Asphalt Concrete |
CMB |
28 |
273.00 (ft)
x 2.50 (ft)
x 4.00 (ft)
|
WESTERN |
247TH |
3,410.51 |
$28,102.60 |
Street Asphalt Concrete |
CMB |
29 |
277.00 (ft)
x 2.50 (ft)
x 4.00 (ft)
|
WESTERN |
247TH |
3,458.71 |
$28,499.81 |
Street Asphalt Concrete |
CMB |
30 |
303.00 (ft)
x 2.50 (ft)
x 4.00 (ft)
|
247TH |
WESTERN |
3,772.05 |
$31,081.67 |
Street Asphalt Concrete |
CMB |
31 |
241.00 (ft)
x 2.50 (ft)
x 4.00 (ft)
|
WESTERN |
248TH |
3,024.87 |
$24,924.92 |
Street Asphalt Concrete |
CMB |
32 |
295.00 (ft)
x 2.50 (ft)
x 4.00 (ft)
|
248TH |
WESTERN |
3,675.64 |
$30,287.25 |
Street Asphalt Concrete |
CMB |
38 |
305.00 (ft)
x 2.50 (ft)
x 4.00 (ft)
|
LOMITA |
WESTERN |
3,937.50 |
$76,545.00 |
Street Asphalt Concrete |
Slurry |
39 |
34.00 (ft)
x 2.50 (ft)
x 4.00 (ft)
|
WESTERN |
249TH |
530.26 |
$4,369.31 |
Street Asphalt Concrete |
Slurry |
IS THIS WORK RELATED TO A CITY NOTICE OF PROPOSED IMPROVEMENT?
|
|
IS STREET NOW UNDER CONSTRUCTION?
|
|
Greater than 1000 sq. ft.
|
ISSUED BY:
Chinh Dinh
|
Reference Number |
2023002016 |
Permit Number |
U-2386-0006
|
W.O. NO. |
UR600984
|
Date Issued |
03/16/2023
|
Date Expires |
02/21/2025
Old Expiration Date : 09/16/2023
|
Work to be Completed by: |
09/25/2023
|
Permit Tag(s) |
|
|
JOB Sq. Ft. |
6,622.50
|
ITEM |
QUANTITY |
UNIT |
RATE |
FEE $ |
U-Permit Excavation <= 1,000 |
1
|
EA
|
$191.00
|
$0.00
|
U-Permit Special Eng Fee |
0.0
|
Hrs
|
$149.00
|
$0.00
|
Special Inspec. Fee |
0.0
|
Hrs
|
$95.00
|
$0.00
|
Overtime Inspec. Fee |
0.0
|
Hrs
|
$95.00
|
$0.00
|
Inspection
|
6,622.50
|
SQ FT
|
Cost
|
Cost
|
BSS Peak Hr. Comp.Fee |
Blvd II (Major Highway - Class II)
|
EA
|
$0.00
|
$0.00
|
LADOT Peak Hr. Comp.Fee |
Blvd II (Major Highway - Class II)
|
EA
|
$0.00
|
$0.00
|
Street Damage (Supp. Delta Values) |
0.00
|
Sq. Ft.
|
|
$0.00
|
SDRF Admin. Fee |
0
|
EA
|
$18.50
|
$0.00
|
SDRF Admin. Surcharge |
0
|
EA
|
|
$0.00
|
CONST MGMT TRAFFIC FEE |
0 Lanes
|
0 Days
|
|
$0.00 |
Dev Srvc Sur (3.0000%)-Min $1 |
|
|
3.00% |
$0.00
|
Equip & Training Sur (7%)-Min $1 |
|
|
7%
|
$0.00
|
TOTAL FEE
|
$0.00
|
JOB NO. |
|
DRAWING NO. |
|
ACCOUNT NO. |
|
U.S.A. NO. |
|
LOCATOR CODE |
|
THOMAS GUIDE PAGE |
793:3:J
|
No Inspection records found.
MUST CALL FOR INSPECTION : (213)485-5080
BEFORE, DURING, AND AFTER CONSTRUCTION
|
|