Print (Reference No. : 2022011833) - Supplemental


****    F O R     I N F O R M A T I O N     O N L Y    ****
GENERAL DEPOSIT
EXCAVATION AND CLASS "A" PERMANENT
RESURFACING APPLICATION / PERMIT
This is a Supplemental to Permit with Reference No. 2020004565. (Original Permit must be attached.)
APPLICANT
MCI Metro Verizon , VCI Construction LLC
ADDRESS
1921 W 11th street 
CITY ZIP TELEPHONE
Upland
91786
951-256-0474
REQUEST PREPARED BY TELEPHONE
ALEX STANLEY
714.509.0068
ALL WORK MUST BE DONE IN ACCORDANCE WITH THE LATEST ADOPTED EDITION & SUPPLEMENTS OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, THE LATEST REVISION OF THE BROWN BOOK, AND THE WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH MANUAL).
JOB ADDRESS
3301 Barham Blvd Suite 201,
Los Angeles, CA 90068
JOB DESCRIPTION:
Work crew to trench +/- 905 linear feet to install conduit for the purpose of placing and splicing new fiber optic cable. Will place 2 new 30"X60" pull box and (1) 4x4 handholes. Work crew will remove and replace +/- 154 square feet of concrete and +/- 875 square feet of asphalt. Will set up corresponding traffic control per the City of Los Angeles standards.

Permit Cuts:
No. L x W x D On Street Cross Street SDRF Sq Ft SDRF Fee Surface Backfill
3 24.00 (ft)
x 2.04 (in)
x 26.00 (in)
BARHAM HOLLYCREST 24.00 $466.56 Street Asphalt Concrete Slurry
4 19.00 (ft)
x 2.04 (in)
x 26.00 (in)
BARHAM W C FIELDS 19.00 $369.36 Street Asphalt Concrete Slurry
5 48.00 (ft)
x 2.04 (in)
x 3.00 (in)
BARHAM W C FIELDS 48.00 $933.12 Street Asphalt Concrete Slurry
9 42.00 (ft)
x 2.04 (in)
x 26.00 (in)
BARHAM W C FIELDS 42.00 $816.48 Parkway Concrete Slurry
11 33.20 (ft)
x 2.04 (in)
x 26.00 (in)
BARHAM W C FIELDS 33.20 $645.41 Parkway Concrete Slurry
12 7.12 (ft)
x 2.04 (in)
x 26.00 (in)
BARHAM W C FIELDS 7.12 $138.41 Parkway Concrete Slurry
13 6.11 (ft)
x 2.04 (in)
x 26.00 (in)
BARHAM W C FIELDS 6.11 $118.78 Parkway Concrete Slurry
14 8.98 (ft)
x 2.04 (in)
x 26.00 (in)
BARHAM W C FIELDS 8.98 $174.57 Parkway Concrete Slurry
15 5.72 (ft)
x 2.04 (in)
x 26.00 (in)
BARHAM W C FIELDS 5.72 $111.20 Parkway Concrete Slurry
16 6.58 (ft)
x 2.04 (in)
x 26.00 (in)
BARHAM W C FIELDS 6.58 $127.92 Parkway Concrete Slurry
19 11.50 (ft)
x 2.04 (in)
x 16.00 (in)
BARHAM W C FIELDS 11.50 $0.00 Parkway Concrete Slurry
31 5.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM W C FIELDS 69.17 $1,344.66 Street Asphalt Concrete Slurry
36 2.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM W C FIELDS 55.34 $1,075.73 Street Asphalt Concrete Slurry
37 2.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM W C FIELDS 55.34 $1,075.73 Street Asphalt Concrete Slurry
38 3.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM W C FIELDS 59.95 $1,165.37 Street Asphalt Concrete Slurry
39 5.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM W C FIELDS 69.17 $1,344.66 Street Asphalt Concrete Slurry
40 20.00 (ft)
x 2.04 (in)
x 26.00 (in)
BARHAM W C FIELDS 20.00 $388.80 Street Asphalt Concrete Slurry
41 10.00 (ft)
x 2.04 (in)
x 26.00 (in)
BARHAM W C FIELDS 10.00 $194.40 Street Asphalt Concrete Slurry
42 100.00 (ft)
x 2.04 (in)
x 26.00 (in)
BARHAM W C FIELDS 100.00 $1,944.00 Street Asphalt Concrete Slurry
43 63.00 (ft)
x 2.04 (in)
x 16.00 (in)
BARHAM BARHAM 63.00 $1,224.72 Street Asphalt Concrete Slurry
44 50.00 (ft)
x 2.04 (in)
x 26.00 (in)
BARHAM BARHAM 50.00 $972.00 Parkway Concrete Slurry
45 37.50 (ft)
x 2.04 (in)
x 26.00 (in)
BARHAM BARHAM 37.50 $729.00 Parkway Concrete Slurry
46 3.00 (ft)
x 5.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 0.00 $0.00 Parkway Concrete Slurry
47 5.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 69.56 $1,352.25 Street Asphalt Concrete Slurry
48 5.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 0.00 $0.00 Parkway Concrete Slurry
49 5.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 68.45 $1,330.62 Street Asphalt Concrete Slurry
50 5.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 68.45 $1,330.62 Street Asphalt Concrete Slurry
51 3.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 0.00 $0.00 Parkway Concrete Slurry
52 3.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 59.32 $1,153.21 Street Asphalt Concrete Slurry
53 3.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 59.32 $1,153.21 Street Asphalt Concrete Slurry
54 2.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 0.00 $0.00 Parkway Concrete Slurry
55 2.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 0.00 $0.00 Parkway Concrete Slurry
56 3.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 0.00 $0.00 Parkway Concrete Slurry
57 3.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 60.29 $1,171.95 Street Asphalt Concrete Slurry
58 3.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 60.29 $1,171.95 Street Asphalt Concrete Slurry
59 5.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 0.00 $0.00 Parkway Concrete Slurry
60 5.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 69.56 $1,352.25 Street Asphalt Concrete Slurry
61 5.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 69.56 $1,352.25 Street Asphalt Concrete Slurry
62 5.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 69.56 $1,352.25 Street Asphalt Concrete Slurry
63 100.00 (ft)
x 2.04 (in)
x 16.00 (in)
BARHAM BARHAM 100.00 $1,944.00 Street Asphalt Concrete Slurry
64 100.00 (ft)
x 2.04 (in)
x 26.00 (in)
BARHAM BARHAM 100.00 $1,944.00 Parkway Concrete Slurry
65 6.00 (ft)
x 2.04 (in)
x 16.00 (in)
BARHAM BLAIR 6.00 $116.64 Parkway Concrete Slurry
67 6.00 (ft)
x 2.04 (in)
x 16.00 (in)
BLAIR BARHAM 6.00 $49.44 Parkway Concrete Slurry
69 3.00 (ft)
x 5.00 (ft)
x 3.00 (ft)
BLAIR BARHAM 0.00 $0.00 Parkway Dirt Native Soil
70 6.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BLAIR BLAIR 0.00 $0.00 Parkway Concrete Slurry
71 2.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BLAIR BLAIR 0.00 $0.00 Parkway Concrete Slurry
72 2.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BLAIR BLAIR 0.00 $0.00 Parkway Concrete Slurry
73 3.50 (ft)
x 1.00 (ft)
x 3.00 (ft)
BLAIR BLAIR 0.00 $0.00 Parkway Concrete Slurry
75 19.50 (ft)
x 1.00 (ft)
x 3.00 (ft)
BLAIR BLAIR 0.00 $0.00 Parkway Dirt Native Soil
76 5.00 (ft)
x 1.00 (ft)
x 5.00 (ft)
BLAIR BLAIR 0.00 $0.00 Parkway Dirt Native Soil
77 5.00 (ft)
x 1.00 (ft)
x 5.00 (ft)
BLAIR BLAIR 0.00 $0.00 Parkway Dirt Native Soil
78 5.00 (ft)
x 1.00 (ft)
x 5.00 (ft)
BLAIR BLAIR 91.75 $755.98 Street Asphalt Concrete Slurry
79 5.00 (ft)
x 1.00 (ft)
x 5.00 (ft)
BLAIR BLAIR 91.75 $755.98 Street Asphalt Concrete Slurry
80 5.00 (ft)
x 1.00 (ft)
x 5.00 (ft)
BLAIR BLAIR 91.75 $755.98 Street Asphalt Concrete Slurry
81 21.50 (ft)
x 2.04 (in)
x 16.00 (in)
BLAIR BLAIR 21.50 $177.16 Street Asphalt Concrete Slurry
82 30.00 (ft)
x 2.04 (in)
x 16.00 (in)
BLAIR BLAIR 30.00 $247.20 Street Asphalt Concrete Slurry
83 4.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BLAIR BARHAM 0.00 $0.00 Street Concrete Slurry
84 4.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BLAIR BARHAM 0.00 $0.00 Street Concrete Slurry
85 2.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BLAIR BARHAM 100.27 $826.25 Street Asphalt Concrete Slurry
86 2.00 (ft)
x 1.00 (ft)
x 26.00 (ft)
BLAIR BARHAM 0.00 $0.00 Street Concrete Slurry
87 11.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BLAIR BARHAM 175.48 $1,445.93 Street Asphalt Concrete Slurry
88 2.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BLAIR BARHAM 100.27 $826.25 Street Asphalt Concrete Slurry
89 5.00 (ft)
x 1.00 (ft)
x 26.00 (ft)
BLAIR BLAIR 91.40 $753.10 Street Asphalt Concrete Slurry
90 5.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BLAIR BLAIR 91.40 $753.10 Street Asphalt Concrete Slurry
91 5.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BLAIR BLAIR 91.40 $753.10 Street Asphalt Concrete Slurry
92 5.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 68.45 $1,330.62 Street Asphalt Concrete Slurry
93 2.50 (ft)
x 1.00 (ft)
x 3.00 (ft)
BARHAM BARHAM 57.04 $1,108.85 Street Asphalt Concrete Slurry

IS THIS WORK RELATED TO A CITY NOTICE OF PROPOSED IMPROVEMENT?
No
IS STREET NOW UNDER CONSTRUCTION?
No

Greater than or equal to 100 and Less than or equal to 1000 sq. ft.
ISSUED BY:   
Chris Chahbaz
Reference Number 2022011833
Permit Number
U-2281-1217
W.O. NO. UR203225
Date Issued 03/08/2023
Date Expires 02/08/2024 Old Expiration Date : 09/08/2023
Work to be Completed by: 09/08/2023
Permit Tag(s)
JOB Sq. Ft.
970.71
ITEM QUANTITY UNIT RATE FEE $
U-Permit Excavation <= 1,000
1
EA
$191.00
$0.00
U-Permit Special Eng Fee
0.0
Hrs
$149.00
$0.00
Special Inspec. Fee
0.0
Hrs
$95.00
$0.00
Overtime Inspec. Fee
0.0
Hrs
$95.00
$0.00
Inspection
970.71
SQ FT
$2.20
$0.00
BSS Peak Hr. Comp.Fee
Ave I (Secondary Highway)
EA
$0.00
$0.00
LADOT Peak Hr. Comp.Fee
Ave I (Secondary Highway)
EA
$0.00
$0.00
Street Damage (Supp. Delta Values)
1,068.24
Sq. Ft.
 
$13,216.89
SDRF Admin. Fee
1
EA
$18.50
$18.50
SDRF Admin. Surcharge
1
EA
$2.30
CONST MGMT TRAFFIC FEE
0 Lanes
0 Days
 
$0.00
Dev Srvc Sur (3.0000%)-Min $1
 
 
3.00%
$0.00
Equip & Training Sur (7%)-Min $1
 
 
7%
$0.00

TOTAL FEE

$13,237.69

JOB NO.
VCI_LAN_N8_UG03 
DRAWING NO.
 
ACCOUNT NO.
 
U.S.A. NO.
 
LOCATOR CODE
 
THOMAS GUIDE PAGE
563:7:D 

INSPECTION REPORT
Inspection ID/Conf. No 467387
Inspection Date 3/28/2024 9:00:00 AM
Inspection Status Not Finalized

INSPECTION REMARKS:
MUST CALL FOR INSPECTION : (213)485-5080
BEFORE, DURING, AND AFTER CONSTRUCTION

GENERAL CONDITIONS:
  1. PRE-INSPECTION MEETING: THE PERMITTEE SHALL CONTACT THE BUREAU OF CONTRACT ADMINSTRATION (INSPECTION) AT (213) 485-5080 FOR A PRE-INSPECTION MEETING PRIOR TO THE START OF WORK. THE FINE FOR WORKING WITHOUT REQUESTING INSPECTION IS $4,000. (LAMC 62.61(e)(1)).
  2. UTILITIES HAVE ONLY BEEN CHECKED TO THE EXTENT OF 10-FT ON BOTH SIDES OF THE TRENCH IN THIS PLAN.
  3. PRIOR TO STARTING CONSTRUCTION, IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING UTILITIES AND CONDUITS, REGARDLESS OF WHETHER OR NOT THEY ARE SHOWN ON THE PLANS, AND TO TAKE APPROPRIATE MEASURES TO PROTECT THEM FROM ANY POTENTIAL DAMAGE.
  4. RECENTLY RESURFACED STREET: THE ISSUANCE OF THIS PERMIT DOES NOT GRANT THE PERMITTEE PERMISSION TO PROCEED TO CUT, EXCAVATE OR DAMAGE A STREET PAVEMENT WHEN THE STREET, THROUGH SITE OBSERVATION, APPEARS TO BE RECENTLY RESURFACED. IN SUCH A CASE, THE PERMITTEE SHALL NOT PROCEED WITH ANY OF THE PERMITTED WORK AND MUST IMMEDIATELY CONTACT THE BUREAU OF ENGINEERING DISTRICT OFFICE THAT ISSUE THE PERMIT. IF THE PERMITTEE PROCEEDS TO WORK WITHOUT CONTACTING THE BUREAU OF ENGINEERING DISTRICT OFFICE, ANY DAMAGE TO A STREET RESURFACED WITHIN ONE YEAR WILL REQUIRE THE PERMITTEE TO REPAVE THE ENTIRE STREET WIDTH FROM BLOCK TO BLOCK.
  5. INSPECTION: BCA INSPECTION (bca.lacity.org/dispatch) MUST BE REQUESTED NO LATER THAN NOON OF THE PRECEDING WORK DAY.
  6. PERMIT ON SITE: A COPY OF THIS PERMIT MUST BE ON THE JOB SITE AT ALL TIMES. THE FINE FOR NOT HAVING THIS PERMIT ON SITE IS $500/DAY (LAMC 62.61(e)(1)).
  7. UNDERGROUND SERVICE ALERT (USA): CALL USA AT LEAST 48 HOURS PRIOR TO START OF WORK: 1-800-277-2600.
  8. 48 HOURS NOTICE: AT LEAST 48 HOURS PRIOR TO THE START OF WORK, CALL BSL AT (323) 913-4721 AND DOT TRAFFIC SIGNAL CONSTRUCTION AT (213) 473-8468.
  9. ONCE PERMITTED EXCAVATION WORK HAS BEGUN, IT MUST BE DILIGENTLY PROSECUTED TO COMPLETION, AND MUST BE COMPLETED BY THE COMPLETION DATE LISTED ON THE PERMIT.
  10. CHANGES: ALL CHANGES TO PLAN OR PERMIT MUST HAVE PRIOR APPROVAL BY THE CITY'S BUREAU OF ENGINEERING
  11. LIABILITY: THE PERMITTEE WILL HOLD THE CITY OF LOS ANGELES HARMLESS FOR ANY INJURY OR HARM CAUSED BY THE PERMITTE'S WORK PERFORMED BY THIS PERMIT.
  12. AC RESURFACING: ANY TRENCHING AND RESURFACING IN STREET ASPHALT SHALL BE PER LATEST VERSION OF LA CITY STANDARD PLAN S-477.
  13. ALL EXCAVATIONS ON ASPHALT CONCRETE STREETS SHALL BE BACKFILLED WITH AN APPROVED SLURRY MIX UNLESS OTHERWISE APPROVED.
  14. JOB SITE MAINTENANCE: THE JOB SITE (INCLUDING TEMPORARY RESURFACING) MUST BE MAINTAINED BY THE PERMITTEE UNTIL PERMANENT RESURFACING IS COMPLETED
  15. TEMPORARY RESURFACING: ALL PERMANENT RESURFACING MUST BE COMPLETED WITHIN 3 WEEKS OF THE TEMPORARY RESURFACING.
  16. ASPHALT TAGS: ALL PERMANENT RESURFACING MUST BE IDENTIFIED BY AN APPROVED MARKER/TAG IDENTIFYING PERMITTEE AND THE YEAR THE WORK WAS COMPLETED. TAGS ARE TO BE PLACED AS CLOSE TO THE CURB AS POSSIBLE. FOR EXCAVATIONS LESS THAN 50' LONG, ONLY ONE TAG SHOULD BE PLACED IN THE MIDDLE. FOR LONGER EXCAVATIONS, TAGS SHOULD BE PLACED AT 50' INTERVALS AND AT BOTH ENDS.
  17. EXPIRED PERMITS: IF WORK HAS NOT BEGUN WITHIN 6 MONTHS FROM DATE OF ISSUANCE, THE PERMIT WILL BE CANCELLED. (LAMC 62.02)
  18. SATURDAY WORK: FOR PERMITS WHERE WORK IS ALLOWED ONLY ON SATURDAY, TRENCHES AND/OR EXCAVATIONS THAT CANNOT BE COMPLETELY BACKFILLED AND RESURFACED IN THE SAME DAY, MUST BE COVERED WITH STEEL PLATES WHICH SHALL BE RECESSED TO FINISHED SURFACE GRADE BY COLD MILLING TO PREVENT MOVEMENT, NOISE, OR VIBRATION.
  19. DECORATIVE IMPROVEMENTS: PERMITTEE SHALL STOP WORK AND CONTACT THE BUREAU OF ENGINEERING PRIOR TO CUTTING OR EXCAVATING ANY DECORATIVE SIDEWALK, PAVEMENT, OR CROSSWALK, UNLESS ALREADY ADDRESSED IN THE PERMIT OR PLANS. ANY UNAUTHORIZED DAMAGE TO THE DECORATIVE SIDEWALK, PAVEMENT, OR CROSSWALK MUST BE REPAIRED OR RECONSTRUCTED IN KIND BY THE PERMITTEE, AS DIRECTED BY THE BUREAU OF ENGINEERING, IN A MANNER SATISFACTORY TO THE INSPECTOR OF PUBLIC WORKS.
  20. ISSUANCE OF THIS PERMIT DOES NOT INVALIDATE THE NEED TO GET APPROVALS OR PERMITS FROM OTHER GOVERNMENTAL AGENCIES THAT MAY HAVE JURISDICTION OVER A SPECIFIC LOCATION (E.G. CALTRANS, LACFCD, CALIFORNIA COASTAL COMMISSION).
  21. THIS PERMIT GRANTS NO AUTHORITY FOR THE PERMANENT OCCUPATION OF THE PUBLIC RIGHT-OF-WAY BY ANY CONDUITS, PIPES, CABLES, WIRES, OR EQUIPMENT OF ANY SORT WHATSOEVER. SEE MUNICIPAL CODE SECTION 62.02(a). BY ISSUING THIS PERMIT THE CITY OF LOS ANGELES MAKES NO REPRESENTATION THAT ANY STATE STATUTE CREATES SUCH AUTHORITY. THE CITY OF LOS ANGELES RESERVES THE RIGHT TO REQUIRE THE OWNER OF THE FACILITIES INSTALLED UNDER THIS PERMIT TO DEMONSTRATE OR OBTAIN SUCH AUTHORITY, SUCH AS, BUT NOT LIMITED TO, A FRANCHISE FOR VIDEO SERVICES, OR REMOVE SAID FACILITIES FROM THE PUBLIC RIGHT-OF-WAY.
  22. 2-DAY ADVANCE NOTICE OF CONSTRUCTION (DAY OF NOTICE FOR PROJECTS OF THREE DAYS OR LESS OF CONSTRUCTION) SHALL BE PROVIDED PER BPW-2024-0536. THE DISTRIBUTION OF THE CONSTRUCTION NOTICE SHALL BE TO THE SATISFACTION OF THE BUREAU OF CONTRACT ADMINISTRATION (BCA). FOR MORE DETAILS, PLEASE REFER TO THE LINK: https://engpermitmanual.lacity.org/other-boe-permitsprocesses/technical-procedures/construction-notification-guidelines
INSPECTION
  1. BUREAU OF CONTRACT ADMINISTRATION INSPECTION WORK MUST BE REQUESTED NO LATER THAN NOON OF PRECEDING WORK DAY. 
    FOR INSPECTION, PLEASE CALL DISPATCH AT:  (213) 485-5080.
    DISPATCH HOURS ARE 7:00 A.M. TO 3:30 P.M.
  2. CALL FOR INSPECTION OF PERMANENT RESURFACING NO LATER THAN NOON OF THE PRECEDING WORK DAY.
  3. ALL CHANGES IN SKETCHES AND PERMIT LIMITS MUST HAVE PRIOR APPROVAL BY THE CITY'S BUREAU OF ENGINEERING.
  4. PEDESTRIAN AND VEHICULAR ACCESS MUST BE MAINTAINED AT ALL TIMES.
  5. IF BARRICADES AND PROTECTIVE DEVICES ARE NOT FURNISHED BY THE CONTRACTOR AS REQUIRED, THE CITY OF LOS ANGELES MAY, AT ITS OPTION, PROVIDE THEM FOR A FEE TO THE CONTRACTOR.
  6. TRAFFIC REQUIREMENTS: ALL TRAFFIC LANES IN MAJOR, SECONDARY, AND COLLECTOR DESIGNATED STREETS SHALL BE UNOBSTRUCTED FROM 6 AM TO 9 AM AND 3:30 PM TO 7 PM. ADDITIONAL TRAFFIC LANES MAY BE CLOSED AT ALL OTHER TIMES WITH A LADOT APPROVED TRAFFIC CONTROL PLAN FOR THIS PERMIT. ADDITIONAL LANE CLOSURES FOR A COLLECTOR OR LOCAL STREET MAY BE CLOSED PER THE W.A.T.C.H. MANUAL OR AN APPROVED TRAFFIC CONTROL PLAN AT THE DISCRETION OF THE PERMITTING ENGINEER.
  7. THE JOB SITE, INCLUDING TEMPORARY RESURFACING, MUST BE MAINTAINED BY THE PERMITTEE UNTIL PERMANENT RESURFACING IS COMPLETED.
  8. ALL PERMANENT RESURFACING MUST BE COMPLETED WITHIN 3 WEEKS OF THE TEMPORARY RESURFACING.
  9. ALL PERMANENT RESURFACING MUST BE IDENTIFIED BY AN APPROVED MARKER/TAG IDENTIFYING PERMITTEE AND THE YEAR THE WORK WAS COMPLETED.  TAGS ARE TO BE PLACED AS CLOSE TO THE CURB AS POSSIBLE.  FOR EXCAVATIONS LESS THAN 50' LONG, ONLY ONE TAG SHOULD BE PLACED IN THE MIDDLE.  FOR LONGER EXCAVATIONS, TAGS SHOULD BE PLACED AT 50' INTERVALS AND AT BOTH ENDS.
  10. ONCE PERMITTED EXCAVATION WORK HAS BEGUN, IT MUST BE DILIGENTLY PROSECUTED TO COMPLETION, AND MUST BE COMPLETED BY THE COMPLETION DATE LISTED ON THE PERMIT.
  11. IF WORK HAS NOT BEGUN WITHIN 6 MONTHS FROM DATE OF ISSUANCE, THE PERMIT WILL BE CANCELLED. (LAMC 62.02)
  12. FOR PERMITS WHERE WORK IS ALLOWED ONLY ON SATURDAY, TRENCHES AND/OR EXCAVATIONS THAT CANNOT BE COMPLETELY BACK-FILLED AND RESURFACED IN THE SAME DAY, MUST BE COVERED WITH STEEL PLATES WHICH SHALL BE RECESSED TO FINISHED SURFACE GRADE BY COLD MILLING TO PREVENT MOVEMENT, NOISE OR VIBRATION.
  13. PERMITTEE SHALL STOP WORK AND CONTACT THE PERMITTING AGENCY PRIOR TO CUTTING OR EXCAVATING ANY DECORATIVE SIDEWALK, PAVEMENT, OR CROSSWALK.
  14. ANY DAMAGE TO DECORATIVE SIDEWALK, PAVEMENT, OR CROSSWALK MUST BE REPAIRED IN KIND OR RECONSTRUCTED IN KIND BY THE PERMITTEE, AS DIRECTED BY THE PERMITTING AGENCY, IN A MANNER SATISFACTORY TO THE CITY ENGINEER AND THE INSPECTOR OF PUBLIC WORKS.
  15. ISSUANCE OF A PERMIT DOES NOT INVALIDATE THE NEED TO GET APPROVALS OR PERMITS FROM OTHER GOVERNMENTAL AGENCIES THAT MAY HAVE JURISDICTION OVER A SPECIFIC LOCATION SUCH AS THE CALIFORNIA COASTAL COMMISSION

PERMIT REQUIREMENTS:

  1. "SDRF" TO BE BILLED
    TOTAL SQ. FT. =  4,842.71SQ. FT.
    TOTAL SDRF FEE =   = $42,625.02
  2. "SSDRF" TO BE BILLED
    TOTAL SSDRF SQ. FT. =  2501 to 5000  SQ. FT.
    TOTAL SSDRF FEE =  = $42,625.02
  3. "SDRF/SSDRF Administration Fee" TO BE BILLED
    TOTAL SDRF ADMINISTRATION FEE =  = $18.50

SPECIAL CONDITIONS LIST
  1. IF CURB AND GUTTER IS DAMAGED DURING CONSTRUCTION, REPLACE CURB AND GUTTER PER LATEST VERSION OF S-410 FROM JOINT TO JOINT.
  2. CITY BOUNDARY: PERMIT ISSUED ONLY FOR L.A. CITY PORTION OF JOB.

TRAFFIC CONTROL CONDITIONS
  1. IMPLEMENT TRAFFIC CONTROL SET UP PER DOT APPROVED PLAN
  2. STEEL TRENCH PLATES: WHEN WORK IS NOT TAKING PLACE ON SITE, STEEL PLATES SHALL COVER TRENCHES AND BE COATED WITH ANTI-SKID MATERIAL, PINNED DOWN, AND ALL EDGES SHALL BE FEATHERED.
  3. STREET ACCESS: MAINTAIN LOCAL AND EMERGENCY ACCESS ON ALL STREETS.
  4. PROVIDE FLAGGERS TO CONTROL PEDESTRIANS AND VEHICULAR TRAFFIC.
  5. MAINTAIN ACCESS TO ALL DRIVEWAYS, SIDEWALKS, AND CROSSWALKS AT ALL TIMES.
  6. STEEL PLATE SHALL BE USED AS BASE FOR OUTRIGGERS ON SIDEWALK.


We recommend that before you click 'Print Permit', you should disable the Footer and Header functions on Page Setup from your browser.