2485 |
5/14/2020
10:54 AM |
5/15/2020
12:00 PM |
Emergency water main repaired, after the fact, paving only. Traffic control as per P.50 in 2016 Watchbook Manual. Paving will be completed by Pipe Line SE Construction. Street is older than 8 years old. T-CAP is not required per S-477-2 | ||||
3073 |
5/22/2020
10:55 AM |
5/26/2020
10:00 AM |
Emergency water main repaired, after the fact, paving only. Traffic control as per P.50 in 2016 Watchbook Manual. Paving will be completed by Pipe Line SE Construction. Street is older than 8 years old. T-CAP is not required per S-477-2 |