Print (Reference No. : 2024008321)


****    F O R     I N F O R M A T I O N     O N L Y    ****
GENERAL DEPOSIT
EXCAVATION AND CLASS "A" PERMANENT
RESURFACING APPLICATION / PERMIT

This Permit has Supplemental Permit(s) with Reference No. 2024010626

APPLICANT
Crown Castle ,
ADDRESS
200 Spectrum Center Drive Suite 1700
CITY ZIP TELEPHONE
Irvine
92618
(949)872-4492
REQUEST PREPARED BY TELEPHONE
Colt Waterbury
6265370184
ALL WORK MUST BE DONE IN ACCORDANCE WITH THE LATEST ADOPTED EDITION & SUPPLEMENTS OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, THE LATEST REVISION OF THE BROWN BOOK, AND THE WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH MANUAL).
JOB ADDRESS
1752 N Main St.
Lincoln Heights, CA 90031
JOB DESCRIPTION:
Crown Castle to open trench and rapid gasket to place conduit for fiber. Place (3) 30"x48" Pullbox

Permit Cuts:
No. L x W x D On Street Cross Street SDRF Sq Ft SDRF Fee Surface Backfill
1 3.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
NORTH MAIN GIBBONS 0.00 $0.00 Parkway Concrete Slurry
2 3.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
NORTH MAIN GIBBONS 0.00 $0.00 Parkway Concrete Slurry
3 2.00 (ft)
x 3.00 (ft)
x 2.00 (ft)
NORTH MAIN GIBBONS 0.00 $0.00 Parkway Concrete Slurry
4 2.00 (ft)
x 3.00 (ft)
x 2.00 (ft)
NORTH MAIN AVENUE 17 0.00 $0.00 Parkway Concrete Slurry
5 5.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN GIBBONS 0.00 $0.00 Parkway Concrete Slurry
6 2.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN GIBBONS 0.00 $0.00 Parkway Concrete Slurry
7 3.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN GIBBONS 3.00 $58.32 Parkway Concrete Slurry
8 4.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN AVENUE 17 0.00 $0.00 Parkway Concrete Slurry
9 2.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN AVENUE 17 0.00 $0.00 Parkway Concrete Slurry
10 3.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN AVENUE 17 3.00 $58.32 Parkway Concrete Slurry
12 170.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN LAMAR 170.00 $3,304.80 Parkway Concrete Slurry
13 160.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN CLOVER 160.00 $3,110.40 Parkway Concrete Slurry
14 2.00 (ft)
x 3.00 (ft)
x 2.00 (ft)
NORTH MAIN AVENUE 19 0.00 $0.00 Parkway Concrete Slurry
15 4.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN CLOVER 0.00 $0.00 Parkway Concrete Slurry
16 2.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN CLOVER 0.00 $0.00 Parkway Concrete Slurry
17 3.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN CLOVER 3.00 $58.32 Parkway Concrete Slurry
18 5.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN AVENUE 19 0.00 $0.00 Parkway Concrete Slurry
19 2.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN AVENUE 19 0.00 $0.00 Parkway Concrete Slurry
20 3.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN AVENUE 19 3.00 $58.32 Parkway Concrete Slurry
21 74.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN CLOVER 74.00 $1,438.56 Parkway Concrete Slurry
22 413.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN CLOVER 413.00 $8,028.72 Parkway Concrete Slurry
23 5.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN AVENUE 19 0.00 $0.00 Parkway Concrete Slurry
24 2.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN AVENUE 19 0.00 $0.00 Parkway Concrete Slurry
25 3.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN AVENUE 19 3.00 $58.32 Parkway Concrete Slurry
26 2.00 (ft)
x 3.00 (ft)
x 2.00 (ft)
NORTH MAIN AVENUE 20 0.00 $0.00 Parkway Concrete Slurry
27 4.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN AVENUE 20 0.00 $0.00 Parkway Concrete Slurry
28 2.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN AVENUE 20 0.00 $0.00 Parkway Concrete Slurry
29 3.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN AVENUE 20 3.00 $58.32 Parkway Concrete Slurry
30 295.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN MOULTON 295.00 $5,734.80 Parkway Concrete Slurry
31 20.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN MOULTON 20.00 $388.80 Parkway Concrete Slurry
32 374.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN MOULTON 374.00 $7,270.56 Parkway Concrete Slurry
33 2.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
NORTH MAIN AVENUE 21 0.00 $0.00 Parkway Concrete Slurry
34 3.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
NORTH MAIN AVENUE 21 0.00 $0.00 Parkway Concrete Slurry
35 184.00 (ft)
x 0.96 (in)
x 0.00 (in)
NORTH MAIN GIBBONS 184.00 $3,576.96 Parkway Concrete

IS THIS WORK RELATED TO A CITY NOTICE OF PROPOSED IMPROVEMENT?
No
IS STREET NOW UNDER CONSTRUCTION?
No

Greater than 1000 sq. ft.
ISSUED BY:   
Nazila Noorifar
Reference Number 2024008321
Permit Number
U-2450-4365
W.O. NO. UR601810
Date Issued 11/09/2024
Date Expires 05/09/2025
Work to be Completed by: 12/06/2024
Permit Tag(s)
JOB Sq. Ft.
1,782.00
ITEM QUANTITY UNIT RATE FEE $
U-Permit Excavation <= 1,000
1
EA
$191.00
$0.00
U-Permit Special Eng Fee
0.0
Hrs
$149.00
$0.00
Special Inspec. Fee
0.0
Hrs
$95.00
$0.00
Overtime Inspec. Fee
0.0
Hrs
$95.00
$0.00
Inspection
1,782.00
SQ FT
Cost
Cost
BSS Peak Hr. Comp.Fee
Ave I (Secondary Highway)
EA
$257.00
$257.00
LADOT Peak Hr. Comp.Fee
Ave I (Secondary Highway)
EA
$0.00
$0.00
Street Damage
1,708.00
Sq. Ft.
 
$33,203.52
SDRF Admin. Fee
1
EA
$18.50
$18.50
SDRF Admin. Surcharge
1
EA
$2.30
CONST MGMT TRAFFIC FEE
0 Lanes
0 Days
 
$0.00
Dev Srvc Sur (3.0000%)-Min $1
 
 
3.00%
$0.00
Equip & Training Sur (7%)-Min $1
 
 
7%
$17.99

TOTAL FEE

$33,499.31

JOB NO.
LINCHTS_014-01 
DRAWING NO.
LINCHTS_014-01 
ACCOUNT NO.
 
U.S.A. NO.
 
LOCATOR CODE
 
THOMAS GUIDE PAGE
634:2:J 

INSPECTION REPORT
Inspection ID/Conf. No 610844
Inspection Date 3/17/2025 10:00:00 AM
Inspection Status Finalized

INSPECTION REMARKS:
MUST CALL FOR INSPECTION : (213)485-5080
BEFORE, DURING, AND AFTER CONSTRUCTION

GENERAL CONDITIONS:
  1. PRE-INSPECTION MEETING: THE PERMITTEE SHALL CONTACT THE BUREAU OF CONTRACT ADMINSTRATION (INSPECTION) AT (213) 485-5080 FOR A PRE-INSPECTION MEETING PRIOR TO THE START OF WORK. THE FINE FOR WORKING WITHOUT REQUESTING INSPECTION IS $4,000. (LAMC 62.61(e)(1)).
  2. UTILITIES HAVE ONLY BEEN CHECKED TO THE EXTENT OF 10-FT ON BOTH SIDES OF THE TRENCH IN THIS PLAN.
  3. PRIOR TO STARTING CONSTRUCTION, IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING UTILITIES AND CONDUITS, REGARDLESS OF WHETHER OR NOT THEY ARE SHOWN ON THE PLANS, AND TO TAKE APPROPRIATE MEASURES TO PROTECT THEM FROM ANY POTENTIAL DAMAGE.
  4. RECENTLY RESURFACED STREET: THE ISSUANCE OF THIS PERMIT DOES NOT GRANT THE PERMITTEE PERMISSION TO PROCEED TO CUT, EXCAVATE OR DAMAGE A STREET PAVEMENT WHEN THE STREET, THROUGH SITE OBSERVATION, APPEARS TO BE RECENTLY RESURFACED. IN SUCH A CASE, THE PERMITTEE SHALL NOT PROCEED WITH ANY OF THE PERMITTED WORK AND MUST IMMEDIATELY CONTACT THE BUREAU OF ENGINEERING DISTRICT OFFICE THAT ISSUE THE PERMIT. IF THE PERMITTEE PROCEEDS TO WORK WITHOUT CONTACTING THE BUREAU OF ENGINEERING DISTRICT OFFICE, ANY DAMAGE TO A STREET RESURFACED WITHIN ONE YEAR WILL REQUIRE THE PERMITTEE TO REPAVE THE ENTIRE STREET WIDTH FROM BLOCK TO BLOCK.
  5. INSPECTION: BCA INSPECTION (bca.lacity.org/dispatch) MUST BE REQUESTED NO LATER THAN NOON OF THE PRECEDING WORK DAY.
  6. PERMIT ON SITE: A COPY OF THIS PERMIT MUST BE ON THE JOB SITE AT ALL TIMES. THE FINE FOR NOT HAVING THIS PERMIT ON SITE IS $500/DAY (LAMC 62.61(e)(1)).
  7. UNDERGROUND SERVICE ALERT (USA): CALL USA AT LEAST 48 HOURS PRIOR TO START OF WORK: 1-800-277-2600.
  8. 48 HOURS NOTICE: AT LEAST 48 HOURS PRIOR TO THE START OF WORK, CALL BSL AT (323) 913-4721 AND DOT TRAFFIC SIGNAL CONSTRUCTION AT (213) 473-8468.
  9. ONCE PERMITTED EXCAVATION WORK HAS BEGUN, IT MUST BE DILIGENTLY PROSECUTED TO COMPLETION, AND MUST BE COMPLETED BY THE COMPLETION DATE LISTED ON THE PERMIT.
  10. CHANGES: ALL CHANGES TO PLAN OR PERMIT MUST HAVE PRIOR APPROVAL BY THE CITY'S BUREAU OF ENGINEERING
  11. LIABILITY: THE PERMITTEE WILL HOLD THE CITY OF LOS ANGELES HARMLESS FOR ANY INJURY OR HARM CAUSED BY THE PERMITTE'S WORK PERFORMED BY THIS PERMIT.
  12. AC RESURFACING: ANY TRENCHING AND RESURFACING IN STREET ASPHALT SHALL BE PER LATEST VERSION OF LA CITY STANDARD PLAN S-477.
  13. ALL EXCAVATIONS ON ASPHALT CONCRETE STREETS SHALL BE BACKFILLED WITH AN APPROVED SLURRY MIX UNLESS OTHERWISE APPROVED.
  14. JOB SITE MAINTENANCE: THE JOB SITE (INCLUDING TEMPORARY RESURFACING) MUST BE MAINTAINED BY THE PERMITTEE UNTIL PERMANENT RESURFACING IS COMPLETED
  15. TEMPORARY RESURFACING: ALL PERMANENT RESURFACING MUST BE COMPLETED WITHIN 3 WEEKS OF THE TEMPORARY RESURFACING.
  16. ASPHALT TAGS: ALL PERMANENT RESURFACING MUST BE IDENTIFIED BY AN APPROVED MARKER/TAG IDENTIFYING PERMITTEE AND THE YEAR THE WORK WAS COMPLETED. TAGS ARE TO BE PLACED AS CLOSE TO THE CURB AS POSSIBLE. FOR EXCAVATIONS LESS THAN 50' LONG, ONLY ONE TAG SHOULD BE PLACED IN THE MIDDLE. FOR LONGER EXCAVATIONS, TAGS SHOULD BE PLACED AT 50' INTERVALS AND AT BOTH ENDS.
  17. EXPIRED PERMITS: IF WORK HAS NOT BEGUN WITHIN 6 MONTHS FROM DATE OF ISSUANCE, THE PERMIT WILL BE CANCELLED. (LAMC 62.02)
  18. SATURDAY WORK: FOR PERMITS WHERE WORK IS ALLOWED ONLY ON SATURDAY, TRENCHES AND/OR EXCAVATIONS THAT CANNOT BE COMPLETELY BACKFILLED AND RESURFACED IN THE SAME DAY, MUST BE COVERED WITH STEEL PLATES WHICH SHALL BE RECESSED TO FINISHED SURFACE GRADE BY COLD MILLING TO PREVENT MOVEMENT, NOISE, OR VIBRATION.
  19. DECORATIVE IMPROVEMENTS: PERMITTEE SHALL STOP WORK AND CONTACT THE BUREAU OF ENGINEERING PRIOR TO CUTTING OR EXCAVATING ANY DECORATIVE SIDEWALK, PAVEMENT, OR CROSSWALK, UNLESS ALREADY ADDRESSED IN THE PERMIT OR PLANS. ANY UNAUTHORIZED DAMAGE TO THE DECORATIVE SIDEWALK, PAVEMENT, OR CROSSWALK MUST BE REPAIRED OR RECONSTRUCTED IN KIND BY THE PERMITTEE, AS DIRECTED BY THE BUREAU OF ENGINEERING, IN A MANNER SATISFACTORY TO THE INSPECTOR OF PUBLIC WORKS.
  20. ISSUANCE OF THIS PERMIT DOES NOT INVALIDATE THE NEED TO GET APPROVALS OR PERMITS FROM OTHER GOVERNMENTAL AGENCIES THAT MAY HAVE JURISDICTION OVER A SPECIFIC LOCATION (E.G. CALTRANS, LACFCD, CALIFORNIA COASTAL COMMISSION).
  21. THIS PERMIT GRANTS NO AUTHORITY FOR THE PERMANENT OCCUPATION OF THE PUBLIC RIGHT-OF-WAY BY ANY CONDUITS, PIPES, CABLES, WIRES, OR EQUIPMENT OF ANY SORT WHATSOEVER. SEE MUNICIPAL CODE SECTION 62.02(a). BY ISSUING THIS PERMIT THE CITY OF LOS ANGELES MAKES NO REPRESENTATION THAT ANY STATE STATUTE CREATES SUCH AUTHORITY. THE CITY OF LOS ANGELES RESERVES THE RIGHT TO REQUIRE THE OWNER OF THE FACILITIES INSTALLED UNDER THIS PERMIT TO DEMONSTRATE OR OBTAIN SUCH AUTHORITY, SUCH AS, BUT NOT LIMITED TO, A FRANCHISE FOR VIDEO SERVICES, OR REMOVE SAID FACILITIES FROM THE PUBLIC RIGHT-OF-WAY.
  22. ADVANCE NOTICE OF CONSTRUCTION SHALL BE PROVIDED PER BPW-2024-0536. THE DISTRIBUTION OF THE CONSTRUCTION NOTICE SHALL BE TO THE SATISFACTION OF THE BUREAU OF CONTRACT ADMINISTRATION (BCA). FOR MORE DETAILS, PLEASE REFER TO THE LINK: https://engpermitmanual.lacity.org/other-boe-permitsprocesses/technical-procedures/construction-notification-guidelines
INSPECTION
  1. BUREAU OF CONTRACT ADMINISTRATION INSPECTION WORK MUST BE REQUESTED NO LATER THAN NOON OF PRECEDING WORK DAY. 
    FOR INSPECTION, PLEASE CALL DISPATCH AT:  (213) 485-5080.
    DISPATCH HOURS ARE 7:00 A.M. TO 3:30 P.M.
  2. CALL FOR INSPECTION OF PERMANENT RESURFACING NO LATER THAN NOON OF THE PRECEDING WORK DAY.
  3. ALL CHANGES IN SKETCHES AND PERMIT LIMITS MUST HAVE PRIOR APPROVAL BY THE CITY'S BUREAU OF ENGINEERING.
  4. PEDESTRIAN AND VEHICULAR ACCESS MUST BE MAINTAINED AT ALL TIMES.
  5. IF BARRICADES AND PROTECTIVE DEVICES ARE NOT FURNISHED BY THE CONTRACTOR AS REQUIRED, THE CITY OF LOS ANGELES MAY, AT ITS OPTION, PROVIDE THEM FOR A FEE TO THE CONTRACTOR.
  6. TRAFFIC REQUIREMENTS: ALL TRAFFIC LANES IN MAJOR, SECONDARY, AND COLLECTOR DESIGNATED STREETS SHALL BE UNOBSTRUCTED FROM 6 AM TO 9 AM AND 3:30 PM TO 7 PM. ADDITIONAL TRAFFIC LANES MAY BE CLOSED AT ALL OTHER TIMES WITH A LADOT APPROVED TRAFFIC CONTROL PLAN FOR THIS PERMIT. ADDITIONAL LANE CLOSURES FOR A COLLECTOR OR LOCAL STREET MAY BE CLOSED PER THE W.A.T.C.H. MANUAL OR AN APPROVED TRAFFIC CONTROL PLAN AT THE DISCRETION OF THE PERMITTING ENGINEER.
  7. THE JOB SITE, INCLUDING TEMPORARY RESURFACING, MUST BE MAINTAINED BY THE PERMITTEE UNTIL PERMANENT RESURFACING IS COMPLETED.
  8. ALL PERMANENT RESURFACING MUST BE COMPLETED WITHIN 3 WEEKS OF THE TEMPORARY RESURFACING.
  9. ALL PERMANENT RESURFACING MUST BE IDENTIFIED BY AN APPROVED MARKER/TAG IDENTIFYING PERMITTEE AND THE YEAR THE WORK WAS COMPLETED.  TAGS ARE TO BE PLACED AS CLOSE TO THE CURB AS POSSIBLE.  FOR EXCAVATIONS LESS THAN 50' LONG, ONLY ONE TAG SHOULD BE PLACED IN THE MIDDLE.  FOR LONGER EXCAVATIONS, TAGS SHOULD BE PLACED AT 50' INTERVALS AND AT BOTH ENDS.
  10. ONCE PERMITTED EXCAVATION WORK HAS BEGUN, IT MUST BE DILIGENTLY PROSECUTED TO COMPLETION, AND MUST BE COMPLETED BY THE COMPLETION DATE LISTED ON THE PERMIT.
  11. IF WORK HAS NOT BEGUN WITHIN 6 MONTHS FROM DATE OF ISSUANCE, THE PERMIT WILL BE CANCELLED. (LAMC 62.02)
  12. FOR PERMITS WHERE WORK IS ALLOWED ONLY ON SATURDAY, TRENCHES AND/OR EXCAVATIONS THAT CANNOT BE COMPLETELY BACK-FILLED AND RESURFACED IN THE SAME DAY, MUST BE COVERED WITH STEEL PLATES WHICH SHALL BE RECESSED TO FINISHED SURFACE GRADE BY COLD MILLING TO PREVENT MOVEMENT, NOISE OR VIBRATION.
  13. PERMITTEE SHALL STOP WORK AND CONTACT THE PERMITTING AGENCY PRIOR TO CUTTING OR EXCAVATING ANY DECORATIVE SIDEWALK, PAVEMENT, OR CROSSWALK.
  14. ANY DAMAGE TO DECORATIVE SIDEWALK, PAVEMENT, OR CROSSWALK MUST BE REPAIRED IN KIND OR RECONSTRUCTED IN KIND BY THE PERMITTEE, AS DIRECTED BY THE PERMITTING AGENCY, IN A MANNER SATISFACTORY TO THE CITY ENGINEER AND THE INSPECTOR OF PUBLIC WORKS.
  15. ISSUANCE OF A PERMIT DOES NOT INVALIDATE THE NEED TO GET APPROVALS OR PERMITS FROM OTHER GOVERNMENTAL AGENCIES THAT MAY HAVE JURISDICTION OVER A SPECIFIC LOCATION SUCH AS THE CALIFORNIA COASTAL COMMISSION

PERMIT REQUIREMENTS:

  1. "SDRF" TO BE BILLED
    TOTAL SQ. FT. =  1,708.00SQ. FT.
    TOTAL SDRF FEE =   = $33,203.52
  2. "SSDRF" TO BE BILLED
    TOTAL SSDRF SQ. FT. =  1 to 2500  SQ. FT.
    TOTAL SSDRF FEE =  = $33,203.52
  3. "SDRF/SSDRF Administration Fee" TO BE BILLED
    TOTAL SDRF ADMINISTRATION FEE =  = $18.50

SPECIAL CONDITIONS LIST
  1. PRIOR TO STARTING CONSTRUCTION, IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING UTILITIES AND CONDUITS, REGARDLESS OF WHETHER OR NOT THEY ARE SHOWN ON THE PLANS, AND TO TAKE APPROPRIATE MEASURES TO PROTECT THEM FROM ANY POTENTIAL DAMAGE.
  2. IF CURB AND GUTTER IS DAMAGED DURING CONSTRUCTION, REPLACE CURB AND GUTTER PER LATEST VERSION OF S-410 FROM JOINT TO JOINT.
  3. IF DRIVEWAY IS DAMAGED DURING CONSTRUCTION, REPLACE ENTIRE DRIVEWAY PER LATEST VERSION OF S-440.
  4. IF SIDEWALK IS DAMAGED DURING CONSTRUCTION, REPLACE ENTIRE SIDEWALK PER LATEST VERSION OF S-444 & S-431.
  5. SEWER AND STORM DRAIN LATERALS WITHIN 5 FEET OF ANY BORING ALIGNMENT (PPM OR HDD) SHALL BE LOCATED AND POTHOLED PRIOR TO BORING OR A PRE AND POST INSTALLATION CCTV IS REQUIRED. THE CCTV SHALL BE INSPECTED AND ACCEPTED BY A BUREAU OF CONTRACT ADMINISTRATION INSPECTOR. A COPY SHALL BE PROVIDED TO THE CITY ENGINEER AT ANY TIME UPON REQUEST. ANY DAMAGE OBSERVED SHALL BE REPAIRED BY A SEWER BONDED CONTRACTOR USING A VALID SEWER PERMIT. THE REPAIR SHALL BE INSPECTED AND ACCEPTED BY A BUREAU OF CONTRACT ADMINISTRATION INSPECTOR. THERE SHALL BE A MINIMUM OF 3 FEET VERTICAL CLEARANCE BETWEEN SEWER AND STORM DRAIN MAINLINES AND THE BORING ALIGNMENT OTHERWISE THE SEWER AND STORM DRAIN SHALL BE EXPOSED. ANY PRE AND POST CCTV OF SEWER AND STORM DRAIN MAINLINES SHALL BE PERFORMED USING A VALID SEWER PERMIT OBTAINED BY A SEWER BONDED CONTRACTOR AND SHALL BE INSPECTED AND ACCEPTED BY A BUREAU OF CONTRACT ADMINISTRATION INSPECTOR.

TRAFFIC CONTROL CONDITIONS
  1. IMPLEMENT TRAFFIC CONTROL SET UP PER DOT APPROVED PLAN
  2. LANE CLOSURES: ALL TRAFFIC LANES IN MAJOR, SECONDARY, AND COLLECTOR DESIGNATED STREETS SHALL BE UNOBSTRUCTED FROM 6 AM TO 9 AM AND 3:30 PM TO 7 PM. ADDITIONAL TRAFFIC LANES MAY BE CLOSED AT ALL OTHER TIMES WITH A LADOT APPROVED TRAFFIC CONTROL PLAN FOR THIS PERMIT. ADDITIONAL LANE CLOSURES FOR A COLLECTOR OR LOCAL STREET MAY BE CLOSED PER THE W.A.T.C.H. MANUAL OR AN APPROVED TRAFFIC CONTROL PLAN AT THE DISCRETION OF THE PERMITTING ENGINEER. SEE HTTPS://ENGPERMITMANUAL.LACITY.ORG/OTHER-BOE-PERMITSPROCESSES/TECHNICAL-PROCEDURES/PEAK-HOUR-RESTRICTIONEXEMPTION-GUIDELINES FOR A CHART IDENTIFYING PEAK HOURS AND NOISE RESTRICTION HOURS.
  3. STREET ACCESS: MAINTAIN LOCAL AND EMERGENCY ACCESS ON ALL STREETS.


We recommend that before you click 'Print Permit', you should disable the Footer and Header functions on Page Setup from your browser.