APPLICANT |
PacBell , Gardena
|
ADDRESS |
100 W. Alondra Blvd.
|
CITY |
ZIP |
TELEPHONE |
Gardena
|
90248
|
310-515-2461
|
REQUEST PREPARED BY |
TELEPHONE |
J5 INFRASTRUCTURE PARTNERS
|
909-965-6099
|
ALL WORK MUST BE DONE IN
ACCORDANCE WITH THE LATEST ADOPTED EDITION & SUPPLEMENTS OF THE STANDARD
SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, THE LATEST REVISION OF THE BROWN BOOK,
AND THE WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH MANUAL).
|
1480 HOLBROOK ST
Los Angeles, CA 90041
|
PLACE 264' 1-4" DUCT FROM POLE # 768896M TO POLE # 25544M.
DIG 7'-6" X 4' REPAIR PIT TO CLEAR BLOCKED DUCT.
DIG 4' X 4' SPLICE PIT, INTERCEPT 1-4" DUCT WITH SPLIT WYE-CAST & PLACE 179' 1-4" DUCT MAKING GOOD FROM MH # 3954 TO POLE # 1004869H.
|
Permit Cuts:
No. |
L x W x D |
On Street |
Cross Street |
SDRF Sq Ft |
SDRF Fee |
Surface |
Backfill |
1 |
1.17 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
HOLBROOK |
LOS ROBLES |
0.00 |
$0.00 |
Parkway Concrete |
Slurry |
2 |
8.67 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
HOLBROOK |
LOS ROBLES |
136.82 |
$1,127.43 |
Street Asphalt Concrete |
Slurry |
3 |
15.50 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
HOLBROOK |
LOS ROBLES |
186.88 |
$1,539.87 |
Street Asphalt Concrete |
Slurry |
4 |
10.50 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
HOLBROOK |
LOS ROBLES |
150.23 |
$1,237.93 |
Street Asphalt Concrete |
Slurry |
5 |
10.50 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
HOLBROOK |
LOS ROBLES |
150.23 |
$1,237.93 |
Street Asphalt Concrete |
Slurry |
7 |
21.83 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
LOS ROBLES |
HOLBROOK |
233.27 |
$1,922.12 |
Street Asphalt Concrete |
Slurry |
8 |
20.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
LOS ROBLES |
HOLBROOK |
219.86 |
$1,811.61 |
Street Asphalt Concrete |
Slurry |
10 |
20.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
LOS ROBLES |
HOLBROOK |
219.86 |
$1,811.61 |
Street Asphalt Concrete |
Slurry |
11 |
20.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
LOS ROBLES |
HOLBROOK |
219.86 |
$1,811.61 |
Street Asphalt Concrete |
Slurry |
12 |
20.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
LOS ROBLES |
HOLBROOK |
219.86 |
$1,811.61 |
Street Asphalt Concrete |
Slurry |
13 |
20.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
LOS ROBLES |
HOLBROOK |
219.86 |
$1,811.61 |
Street Asphalt Concrete |
Slurry |
14 |
20.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
LOS ROBLES |
HOLBROOK |
219.86 |
$1,811.61 |
Street Asphalt Concrete |
Slurry |
15 |
20.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
LOS ROBLES |
HOLBROOK |
219.86 |
$1,811.61 |
Street Asphalt Concrete |
Slurry |
16 |
20.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
LOS ROBLES |
HOLBROOK |
219.86 |
$1,811.61 |
Street Asphalt Concrete |
Slurry |
17 |
20.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
LOS ROBLES |
HOLBROOK |
219.86 |
$1,811.61 |
Street Asphalt Concrete |
Slurry |
18 |
9.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
LOS ROBLES |
HOLBROOK |
139.24 |
$1,147.35 |
Street Asphalt Concrete |
Slurry |
19 |
1.83 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
LOS ROBLES |
HOLBROOK |
0.00 |
$0.00 |
Parkway Concrete |
Slurry |
20 |
7.50 (ft)
x 4.00 (ft)
x 3.00 (ft)
|
HOLBROOK |
MOUNT HELENA |
195.50 |
$1,610.94 |
Street Asphalt Concrete |
Slurry |
21 |
4.00 (ft)
x 4.00 (ft)
x 3.00 (ft)
|
HOLBROOK |
MOUNT HELENA |
156.40 |
$1,288.75 |
Street Asphalt Concrete |
Slurry |
23 |
10.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
HOLBROOK |
MOUNT HELENA |
175.55 |
$1,446.56 |
Street Asphalt Concrete |
Slurry |
25 |
75.75 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
HOLBROOK |
MOUNT HELENA |
752.68 |
$6,202.11 |
Street Asphalt Concrete |
Slurry |
26 |
6.25 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
HOLBROOK |
MOUNT HELENA |
142.64 |
$1,175.33 |
Street Asphalt Concrete |
Slurry |
28 |
67.17 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
MOUNT HELENA |
HOLBROOK |
677.37 |
$5,581.54 |
Street Asphalt Concrete |
Slurry |
29 |
5.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
MOUNT HELENA |
HOLBROOK |
131.66 |
$1,084.92 |
Street Asphalt Concrete |
Slurry |
30 |
5.00 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
MOUNT HELENA |
HOLBROOK |
131.66 |
$1,084.92 |
Street Asphalt Concrete |
Slurry |
31 |
1.01 (ft)
x 1.00 (ft)
x 3.00 (ft)
|
MOUNT HELENA |
HOLBROOK |
0.00 |
$0.00 |
Parkway Concrete |
Slurry |
IS THIS WORK RELATED TO A CITY NOTICE OF PROPOSED IMPROVEMENT?
|
|
IS STREET NOW UNDER CONSTRUCTION?
|
|
Greater than or equal to 100 and Less than or equal to 1000 sq. ft.
|
ISSUED BY:
Adrian Sanchez
|
Reference Number |
2021007445 |
Permit Number |
U-2150-3413
|
W.O. NO. |
N/A
|
Date Issued |
07/02/2021
|
Date Expires |
08/28/2023
|
Work to be Completed by: |
11/13/2021
|
Permit Tag(s) |
|
|
JOB Sq. Ft. |
477.00
|
ITEM |
QUANTITY |
UNIT |
RATE |
FEE $ |
U-Permit Excavation <= 1,000 |
1
|
EA
|
$191.00
|
$191.00
|
U-Permit Special Eng Fee |
3.0
|
Hrs
|
$149.00
|
$447.00
|
Special Inspec. Fee |
0.0
|
Hrs
|
$95.00
|
$0.00
|
Overtime Inspec. Fee |
0.0
|
Hrs
|
$95.00
|
$0.00
|
Inspection
|
477.00
|
SQ FT
|
$2.20
|
$1,049.40
|
BSS Peak Hr. Comp.Fee |
Local Std (Local Street)
|
EA
|
$0.00
|
$0.00
|
LADOT Peak Hr. Comp.Fee |
Local Std (Local Street)
|
EA
|
$0.00
|
$0.00
|
Street Damage |
5,338.86
|
Sq. Ft.
|
|
$43,992.19
|
SDRF Admin. Fee |
1
|
EA
|
$18.50
|
$18.50
|
SDRF Admin. Surcharge |
1
|
EA
|
|
$2.30
|
CONST MGMT TRAFFIC FEE |
0 Lanes
|
0 Days
|
|
$0.00 |
Dev Srvc Sur (3.0000%)-Min $1 |
|
|
3.00% |
$50.62
|
Equip & Training Sur (7%)-Min $1 |
|
|
7%
|
$118.12
|
TOTAL FEE
|
$45,869.13
|
JOB NO. |
G103_A0224E9_1 OF 2_IFP_REL 0-1_LTID 34135
|
DRAWING NO. |
|
ACCOUNT NO. |
|
U.S.A. NO. |
|
LOCATOR CODE |
|
THOMAS GUIDE PAGE |
565:6:C
|
Inspection ID/Conf. No |
393767
|
Inspection Date |
9/12/2023 12:00:00 PM
|
Inspection Status
|
Finalized
|
MUST CALL FOR INSPECTION : (213)485-5080
BEFORE, DURING, AND AFTER CONSTRUCTION
|
|