Print (Reference No. : 2020009369)


****    F O R     I N F O R M A T I O N     O N L Y    ****
GENERAL DEPOSIT
EXCAVATION AND CLASS "A" PERMANENT
RESURFACING APPLICATION / PERMIT

This Permit has Supplemental Permit(s) with Reference No. 2022001367

APPLICANT
AT&T , c/o Eukon Group
ADDRESS
630 S. Grand Ave. 
CITY ZIP TELEPHONE
Santa Ana
92705
949-648-6995
REQUEST PREPARED BY TELEPHONE
Sonal Thakur
949-565-6501
ALL WORK MUST BE DONE IN ACCORDANCE WITH THE LATEST ADOPTED EDITION & SUPPLEMENTS OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, THE LATEST REVISION OF THE BROWN BOOK, AND THE WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH MANUAL).
JOB ADDRESS
18901 Chatsworth Street
Los Angeles, CA 91326
JOB DESCRIPTION:
Existing BSL SL pole to be removed & replaced by foundation. AT&T to install 2" conduit from the fiber pullbox to the new SL location.

Permit Cuts:
No. L x W x D On Street Cross Street SDRF Sq Ft SDRF Fee Surface Backfill
1 7.00 (ft)
x 2.00 (ft)
x 2.00 (ft)
WILBUR CHATSWORTH 0.00 $0.00 Parkway Concrete Slurry
2 2.00 (ft)
x 2.00 (ft)
x 2.00 (ft)
WILBUR CHATSWORTH 0.00 $0.00 Parkway Concrete CAB

IS THIS WORK RELATED TO A CITY NOTICE OF PROPOSED IMPROVEMENT?
No
IS STREET NOW UNDER CONSTRUCTION?
No

Less than 100 sq. ft
ISSUED BY:   
 
Reference Number 2020009369
Permit Number
U-2081-3349
W.O. NO. N/A
Date Issued 11/09/2020
Date Expires 08/28/2023
Work to be Completed by: 08/05/2021
Permit Tag(s)
JOB Sq. Ft.
18.00
ITEM QUANTITY UNIT RATE FEE $
U-Permit Excavation <= 1,000
1
EA
$191.00
$191.00
U-Permit Special Eng Fee
0.0
Hrs
$149.00
$0.00
Special Inspec. Fee
0.0
Hrs
$95.00
$0.00
Overtime Inspec. Fee
0.0
Hrs
$95.00
$0.00
Inspection
18.00
SQ FT
$114.00
$114.00
BSS Peak Hr. Comp.Fee
Ave I (Secondary Highway)
EA
$257.00
$257.00
LADOT Peak Hr. Comp.Fee
Ave I (Secondary Highway)
EA
$5.00
$5.00
Street Damage
0.00
Sq. Ft.
 
$0.00
SDRF Admin. Fee
0
EA
$18.50
$0.00
SDRF Admin. Surcharge
0
EA
$0.00
CONST MGMT TRAFFIC FEE
0 Lanes
0 Days
 
$0.00
Dev Srvc Sur (3.0000%)-Min $1
 
 
3.00%
$9.15
Equip & Training Sur (7%)-Min $1
 
 
7%
$39.69

TOTAL FEE

$615.84

JOB NO.
PTRCH-002 
DRAWING NO.
 
ACCOUNT NO.
 
U.S.A. NO.
 
LOCATOR CODE
 
THOMAS GUIDE PAGE
500-G3 

INSPECTION REPORT

No Inspection records found.


INSPECTION REMARKS:
MUST CALL FOR INSPECTION : (213)485-5080
BEFORE, DURING, AND AFTER CONSTRUCTION

GENERAL CONDITIONS:
  1. PRE-INSPECTION MEETING: THE PERMITTEE SHALL CONTACT THE BUREAU OF CONTRACT ADMINSTRATION (INSPECTION) AT (213) 485-5080 FOR A PRE-INSPECTION MEETING PRIOR TO THE START OF WORK. THE FINE FOR WORKING WITHOUT REQUESTING INSPECTION IS $4,000. (LAMC 62.61(e)(1)).
  2. UTILITIES HAVE ONLY BEEN CHECKED TO THE EXTENT OF 10-FT ON BOTH SIDES OF THE TRENCH IN THIS PLAN.
  3. PRIOR TO STARTING CONSTRUCTION, IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING UTILITIES AND CONDUITS, REGARDLESS OF WHETHER OR NOT THEY ARE SHOWN ON THE PLANS, AND TO TAKE APPROPRIATE MEASURES TO PROTECT THEM FROM ANY POTENTIAL DAMAGE.
  4. RECENTLY RESURFACED STREET: THE ISSUANCE OF THIS PERMIT DOES NOT GRANT THE PERMITTEE PERMISSION TO PROCEED TO CUT, EXCAVATE OR DAMAGE A STREET PAVEMENT WHEN THE STREET, THROUGH SITE OBSERVATION, APPEARS TO BE RECENTLY RESURFACED. IN SUCH A CASE, THE PERMITTEE SHALL NOT PROCEED WITH ANY OF THE PERMITTED WORK AND MUST IMMEDIATELY CONTACT THE BUREAU OF ENGINEERING DISTRICT OFFICE THAT ISSUE THE PERMIT. IF THE PERMITTEE PROCEEDS TO WORK WITHOUT CONTACTING THE BUREAU OF ENGINEERING DISTRICT OFFICE, ANY DAMAGE TO A STREET RESURFACED WITHIN ONE YEAR WILL REQUIRE THE PERMITTEE TO REPAVE THE ENTIRE STREET WIDTH FROM BLOCK TO BLOCK.
  5. INSPECTION: BCA INSPECTION (bca.lacity.org/dispatch) MUST BE REQUESTED NO LATER THAN NOON OF THE PRECEDING WORK DAY.
  6. PERMIT ON SITE: A COPY OF THIS PERMIT MUST BE ON THE JOB SITE AT ALL TIMES. THE FINE FOR NOT HAVING THIS PERMIT ON SITE IS $500/DAY (LAMC 62.61(e)(1)).
  7. UNDERGROUND SERVICE ALERT (USA): CALL USA AT LEAST 48 HOURS PRIOR TO START OF WORK: 1-800-277-2600.
  8. 48 HOURS NOTICE: AT LEAST 48 HOURS PRIOR TO THE START OF WORK, CALL BSL AT (323) 913-4721 AND DOT TRAFFIC SIGNAL CONSTRUCTION AT (213) 473-8468.
  9. ONCE PERMITTED EXCAVATION WORK HAS BEGUN, IT MUST BE DILIGENTLY PROSECUTED TO COMPLETION, AND MUST BE COMPLETED BY THE COMPLETION DATE LISTED ON THE PERMIT.
  10. CHANGES: ALL CHANGES TO PLAN OR PERMIT MUST HAVE PRIOR APPROVAL BY THE CITY'S BUREAU OF ENGINEERING
  11. LIABILITY: THE PERMITTEE WILL HOLD THE CITY OF LOS ANGELES HARMLESS FOR ANY INJURY OR HARM CAUSED BY THE PERMITTE'S WORK PERFORMED BY THIS PERMIT.
  12. AC RESURFACING: ANY TRENCHING AND RESURFACING IN STREET ASPHALT SHALL BE PER LATEST VERSION OF LA CITY STANDARD PLAN S-477.
  13. ALL EXCAVATIONS ON ASPHALT CONCRETE STREETS SHALL BE BACKFILLED WITH AN APPROVED SLURRY MIX UNLESS OTHERWISE APPROVED.
  14. JOB SITE MAINTENANCE: THE JOB SITE (INCLUDING TEMPORARY RESURFACING) MUST BE MAINTAINED BY THE PERMITTEE UNTIL PERMANENT RESURFACING IS COMPLETED
  15. TEMPORARY RESURFACING: ALL PERMANENT RESURFACING MUST BE COMPLETED WITHIN 3 WEEKS OF THE TEMPORARY RESURFACING.
  16. ASPHALT TAGS: ALL PERMANENT RESURFACING MUST BE IDENTIFIED BY AN APPROVED MARKER/TAG IDENTIFYING PERMITTEE AND THE YEAR THE WORK WAS COMPLETED. TAGS ARE TO BE PLACED AS CLOSE TO THE CURB AS POSSIBLE. FOR EXCAVATIONS LESS THAN 50' LONG, ONLY ONE TAG SHOULD BE PLACED IN THE MIDDLE. FOR LONGER EXCAVATIONS, TAGS SHOULD BE PLACED AT 50' INTERVALS AND AT BOTH ENDS.
  17. EXPIRED PERMITS: IF WORK HAS NOT BEGUN WITHIN 6 MONTHS FROM DATE OF ISSUANCE, THE PERMIT WILL BE CANCELLED. (LAMC 62.02)
  18. SATURDAY WORK: FOR PERMITS WHERE WORK IS ALLOWED ONLY ON SATURDAY, TRENCHES AND/OR EXCAVATIONS THAT CANNOT BE COMPLETELY BACKFILLED AND RESURFACED IN THE SAME DAY, MUST BE COVERED WITH STEEL PLATES WHICH SHALL BE RECESSED TO FINISHED SURFACE GRADE BY COLD MILLING TO PREVENT MOVEMENT, NOISE, OR VIBRATION.
  19. DECORATIVE IMPROVEMENTS: PERMITTEE SHALL STOP WORK AND CONTACT THE BUREAU OF ENGINEERING PRIOR TO CUTTING OR EXCAVATING ANY DECORATIVE SIDEWALK, PAVEMENT, OR CROSSWALK, UNLESS ALREADY ADDRESSED IN THE PERMIT OR PLANS. ANY UNAUTHORIZED DAMAGE TO THE DECORATIVE SIDEWALK, PAVEMENT, OR CROSSWALK MUST BE REPAIRED OR RECONSTRUCTED IN KIND BY THE PERMITTEE, AS DIRECTED BY THE BUREAU OF ENGINEERING, IN A MANNER SATISFACTORY TO THE INSPECTOR OF PUBLIC WORKS.
  20. ISSUANCE OF THIS PERMIT DOES NOT INVALIDATE THE NEED TO GET APPROVALS OR PERMITS FROM OTHER GOVERNMENTAL AGENCIES THAT MAY HAVE JURISDICTION OVER A SPECIFIC LOCATION (E.G. CALTRANS, LACFCD, CALIFORNIA COASTAL COMMISSION).
  21. THIS PERMIT GRANTS NO AUTHORITY FOR THE PERMANENT OCCUPATION OF THE PUBLIC RIGHT-OF-WAY BY ANY CONDUITS, PIPES, CABLES, WIRES, OR EQUIPMENT OF ANY SORT WHATSOEVER. SEE MUNICIPAL CODE SECTION 62.02(a). BY ISSUING THIS PERMIT THE CITY OF LOS ANGELES MAKES NO REPRESENTATION THAT ANY STATE STATUTE CREATES SUCH AUTHORITY. THE CITY OF LOS ANGELES RESERVES THE RIGHT TO REQUIRE THE OWNER OF THE FACILITIES INSTALLED UNDER THIS PERMIT TO DEMONSTRATE OR OBTAIN SUCH AUTHORITY, SUCH AS, BUT NOT LIMITED TO, A FRANCHISE FOR VIDEO SERVICES, OR REMOVE SAID FACILITIES FROM THE PUBLIC RIGHT-OF-WAY.
  22. 2-DAY ADVANCE NOTICE OF CONSTRUCTION (DAY OF NOTICE FOR PROJECTS OF THREE DAYS OR LESS OF CONSTRUCTION) SHALL BE PROVIDED PER BPW-2024-0536. THE DISTRIBUTION OF THE CONSTRUCTION NOTICE SHALL BE TO THE SATISFACTION OF THE BUREAU OF CONTRACT ADMINISTRATION (BCA). FOR MORE DETAILS, PLEASE REFER TO THE LINK: https://engpermitmanual.lacity.org/other-boe-permitsprocesses/technical-procedures/construction-notification-guidelines
INSPECTION
  1. BUREAU OF CONTRACT ADMINISTRATION INSPECTION WORK MUST BE REQUESTED NO LATER THAN NOON OF PRECEDING WORK DAY. 
    FOR INSPECTION, PLEASE CALL DISPATCH AT:  (213) 485-5080.
    DISPATCH HOURS ARE 7:00 A.M. TO 3:30 P.M.
  2. CALL FOR INSPECTION OF PERMANENT RESURFACING NO LATER THAN NOON OF THE PRECEDING WORK DAY.
  3. ALL CHANGES IN SKETCHES AND PERMIT LIMITS MUST HAVE PRIOR APPROVAL BY THE CITY'S BUREAU OF ENGINEERING.
  4. PEDESTRIAN AND VEHICULAR ACCESS MUST BE MAINTAINED AT ALL TIMES.
  5. IF BARRICADES AND PROTECTIVE DEVICES ARE NOT FURNISHED BY THE CONTRACTOR AS REQUIRED, THE CITY OF LOS ANGELES MAY, AT ITS OPTION, PROVIDE THEM FOR A FEE TO THE CONTRACTOR.
  6. TRAFFIC REQUIREMENTS: ALL TRAFFIC LANES IN MAJOR, SECONDARY, AND COLLECTOR DESIGNATED STREETS SHALL BE UNOBSTRUCTED FROM 6 AM TO 9 AM AND 3:30 PM TO 7 PM. ADDITIONAL TRAFFIC LANES MAY BE CLOSED AT ALL OTHER TIMES WITH A LADOT APPROVED TRAFFIC CONTROL PLAN FOR THIS PERMIT. ADDITIONAL LANE CLOSURES FOR A COLLECTOR OR LOCAL STREET MAY BE CLOSED PER THE W.A.T.C.H. MANUAL OR AN APPROVED TRAFFIC CONTROL PLAN AT THE DISCRETION OF THE PERMITTING ENGINEER.
  7. THE JOB SITE, INCLUDING TEMPORARY RESURFACING, MUST BE MAINTAINED BY THE PERMITTEE UNTIL PERMANENT RESURFACING IS COMPLETED.
  8. ALL PERMANENT RESURFACING MUST BE COMPLETED WITHIN 3 WEEKS OF THE TEMPORARY RESURFACING.
  9. ALL PERMANENT RESURFACING MUST BE IDENTIFIED BY AN APPROVED MARKER/TAG IDENTIFYING PERMITTEE AND THE YEAR THE WORK WAS COMPLETED.  TAGS ARE TO BE PLACED AS CLOSE TO THE CURB AS POSSIBLE.  FOR EXCAVATIONS LESS THAN 50' LONG, ONLY ONE TAG SHOULD BE PLACED IN THE MIDDLE.  FOR LONGER EXCAVATIONS, TAGS SHOULD BE PLACED AT 50' INTERVALS AND AT BOTH ENDS.
  10. ONCE PERMITTED EXCAVATION WORK HAS BEGUN, IT MUST BE DILIGENTLY PROSECUTED TO COMPLETION, AND MUST BE COMPLETED BY THE COMPLETION DATE LISTED ON THE PERMIT.
  11. IF WORK HAS NOT BEGUN WITHIN 6 MONTHS FROM DATE OF ISSUANCE, THE PERMIT WILL BE CANCELLED. (LAMC 62.02)
  12. FOR PERMITS WHERE WORK IS ALLOWED ONLY ON SATURDAY, TRENCHES AND/OR EXCAVATIONS THAT CANNOT BE COMPLETELY BACK-FILLED AND RESURFACED IN THE SAME DAY, MUST BE COVERED WITH STEEL PLATES WHICH SHALL BE RECESSED TO FINISHED SURFACE GRADE BY COLD MILLING TO PREVENT MOVEMENT, NOISE OR VIBRATION.
  13. PERMITTEE SHALL STOP WORK AND CONTACT THE PERMITTING AGENCY PRIOR TO CUTTING OR EXCAVATING ANY DECORATIVE SIDEWALK, PAVEMENT, OR CROSSWALK.
  14. ANY DAMAGE TO DECORATIVE SIDEWALK, PAVEMENT, OR CROSSWALK MUST BE REPAIRED IN KIND OR RECONSTRUCTED IN KIND BY THE PERMITTEE, AS DIRECTED BY THE PERMITTING AGENCY, IN A MANNER SATISFACTORY TO THE CITY ENGINEER AND THE INSPECTOR OF PUBLIC WORKS.
  15. ISSUANCE OF A PERMIT DOES NOT INVALIDATE THE NEED TO GET APPROVALS OR PERMITS FROM OTHER GOVERNMENTAL AGENCIES THAT MAY HAVE JURISDICTION OVER A SPECIFIC LOCATION SUCH AS THE CALIFORNIA COASTAL COMMISSION

TRAFFIC CONTROL CONDITIONS
  1. Traffic control setup per the latest edition of the Manual of Uniform Traffic Control Devices (MUTCD 2006) and the Work Area Traffic Control Handbook (WATCH Manual), 2006 Edition.
  2. LADOT has implemented a new stand-alone system for Worksite Traffic Control Plan (WTCP) review. To obtain worksite traffic control plan approval please visit  http:/ladot.lacity.org
    CLICK CTTC (CITYWIDE TEMPORARY TRAFFIC CONTROL PLAN REVIEW)
  3. Work hours: 9 am  to 3:30 pm weekdays only .
  4. Post tow-away no stopping signs adjacent to work area for hours from  to     only,as required by The Worksite Traffic Control Plan(s). Call 213-485-2298 for posting at least 4 days prior to start of any work.
  5. Steel Plate excavation(s) for pedestrians and vehicles when not on site. Steel plates shall be coated with anti-skid material, pinned down and all edges feathered.
  6. Provide flaggers to control pedestrians on sidewalks.
  7. Maintain local and emergency access on ALL STREETS.
  8. Maintain access to all driveways.
  9. Outriggers shall not be placed on sidewalk.
  10. Provide flaggers to control pedestrians and vehicular traffic.
  11. Steel plate shall be used as base for outriggers on sidewalk.
  12. Sweep sidewalk after the job is completed.

PERMIT REQUIREMENTS:

  1. "SDRF" TO BE BILLED
    TOTAL SQ. FT. =  0.00SQ. FT.
    TOTAL SDRF FEE =   = $0.00
  2. "SSDRF" TO BE BILLED
    TOTAL SSDRF SQ. FT. =  0  SQ. FT.
    TOTAL SSDRF FEE =  = $0.00
  3. "SDRF/SSDRF Administration Fee" TO BE BILLED
    TOTAL SDRF ADMINISTRATION FEE =  = $0.00
  1. MUST CALL FOR INSPECTION 213-485-5080 24 HOURS BEFORE START OF WORK.
  2. THIS PERMIT GRANTS NO AUTHORITY FOR THE PERMANENT OCCUPATION OF THE PUBLIC RIGHT-OF-WAY BY ANY CONDUITS, PIPES, CABLES, WIRES, OR EQUIPMENT OF ANY SORT WHATSOEVER. SEE MUNICIPAL CODE SECTION 62.02(a). BY ISSUING THIS PERMIT THE CITY OF LOS ANGELES MAKES NO REPRESENTATION THAT ANY STATE STATUTE CREATES SUCH AUTHORITY. THE CITY OF LOS ANGELES RESERVES THE RIGHT TO REQUIRE THE OWNER OF THE FACILITIES INSTALLED UNDER THIS PERMIT TO DEMONSTRATE OR OBTAIN SUCH AUTHORITY, SUCH AS, BUT NOT LIMITED TO, A FRANCHISE FOR VIDEO SERVICES, OR REMOVE SAID FACILITIES FROM THE PUBLIC RIGHT-OF-WAY.
  3. PERMIT ISSUED ONLY FOR L.A. CITY PORTION OF JOB.
  4. BACKFILL REQUIREMENTS:
    CURB TO CURB -- COMPACT EXISTING SOIL WITH MINIMUM 90% COMPACTION AND 95% FOR TOP 6 INCHES OR BACKFILL WITH SLURRY.
    PARKWAY -- COMPACT EXISTING SOIL WITH MINIMUM 90% COMPACTION AND 95% FOR TOP 6 INCHES.
  5. IMPORTANT NOTICE:
    SECTION 4216/4217 OF THE GOVERNMENT CODE REQUIRES A DIGALERT IDENTIFICATION NUMBER BE ISSUED BEFORE A "PERMIT TO EXCAVATE" WILL BE VALID. FOR YOUR DIGALERT I.D. NUMBER, CALL UNDERGROUND SERVICE ALERT AT TOLL FREE 1-800-227-2600 TWO WORKING DAYS BEFORE YOU DIG.



We recommend that before you click 'Print Permit', you should disable the Footer and Header functions on Page Setup from your browser.