Stormdrain Plan Check Requirements
HYDROLOGY
  • Map-mainline & catch basin
  • Calculations-mainline and catch basin

HYDRAULICS

  • Mainline calculations
  • Catch basin calculations
  • Acceptable street, sewer and grading plans

TITLE SHEET

  • Gen. Notes to Contractor
  • Key map
  • Index to Sheets
  • List of Standard Plans
  • Title
  • Bench Mark
  • Private Engineer's Signature and seal (R.C.E.) with
  • expiration date
  • L.A.C.D.P.W. or Corps of Engineers Permit
  • where applicable (copy attached)
  • Resurfacing schedule
  • Typical street cross section
  • Other

PLAN AND PROFILE

  • Stations
  • Elevations
  • Grades including F.S. over S.D.
  • Structures identified
  • Street shown including proposed
  • or existing improvements
  • Ties and curve data
  • Substructures & sewers shown
  • including H.C.’s
  • Hydraulic grade line
  • design Q’s shown
  • Other

©  1999-2025 Bureau of Engineering
Department of Public Works, City of Los Angeles. Version 1.0

Device-Neutral, Web-Responsive