Confirmation No. | Ref. No. | Work Order | Work Location | Job Description | Inspection Type | Inspection Status | Inspected By | Request Created On | Contractor/Onsite Information | Requested Inspection Date Time | Inspection Comments | Inspection Completed On | Is Cancelled | Cancelled Date Time |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
307211 | 102346 | 341 S CLIFFWOOD AVE LOS ANGELES CA 90049 | PRE-CONSTRUCTION INSPECTION - DRVWY / CURB DRAIN | Driveway Inspection | Intermediate |
Haig Baklayan 213-256-1904 haig.baklayan@lacity.org |
02/09/2023 01:05 PM |
CRUZ CONCRETE RUDY NUNEZ XSACONCRETE@GMAIL.COM 661-618-6251 |
02/16/2023 11:00 AM | -Arrived at job site. Met with Rudy Nunez from Cruz Concrete. Conducted pre con meeting for A permit. Discussed and reviewed LA City standards S-440. Gave standards to contractor. Informed contractor that anything built within City property needs to be per City standards and also approved by BOE. Note: Pl from curb face to pl is 22’-6”. | 02/16/2023 10:56 AM | |||
319264 | 102346 | 341 S CLIFFWOOD AVE LOS ANGELES CA 90049 | FORMS INSPECTION | Driveway Inspection | Intermediate |
Andrew Haro 213-798-5798 andrew.haro@lacity.org |
03/13/2023 01:10 PM |
AMG EXPERIENCE RUDY NUNEZ INFO@AMGEXPERIENCE.COM 661-618-6251 |
03/20/2023 09:00 AM | 03/20/2023. Driveway/ Curb Drain- Form Inspection. Met with Contractor and verified that forms and curb drains were in compliance with city standards and specifications. Discussed finishes, joints, and edges with the contractor. Allowed contractor to proceed with concrete placement. Contractor may schedule for inspection when ready. Andrew H. assisting CI Ismael Perez. IT’s Gregory Gilpen and Edgar Calderon on site. | 03/20/2023 02:50 PM | |||
324193 | 102346 | 341 S CLIFFWOOD AVE LOS ANGELES CA 90049 | FORMS INSP | Driveway Inspection | Intermediate |
ismael Perez (B) 213-485-5080 ismael.perez@lacity.org |
03/24/2023 10:26 AM |
JAKE JAKE INFO@AMGEXPERIENCE.COM 312-887-1280 |
03/28/2023 01:30 PM | 03/28/2023. AC slot cut restoration. Observed CMB placed and compacted allowing only for 4' of AC. Instructed the contractor to remove 2" to allow the 2" wearing cap. Contractor to correct and show proof of the correction as discussed. I. Perez | 03/28/2023 09:06 PM | |||
328480 | 102346 | 341 S CLIFFWOOD AVE LOS ANGELES CA 90049 | REQUEST MEET FOR FINAL INSPECTION - DRVWY / CURB DRAINS (3) | Driveway Inspection | Intermediate |
ismael Perez (B) 213-485-5080 ismael.perez@lacity.org |
04/03/2023 10:47 AM |
RUDOLFO NUNEZ RUDOLFO NUNEZ INFO@AMGEXPERIENCE.COM 661-618-6251 |
04/04/2023 11:00 AM | 04/04/2023. DW, CD Final. Unable to finalize this permit. Contractor to correct as follows....1) Complete the AC restoration frontage of newly constructed DW...2) Complete Backfill top of curb drain pipe..3) Grade and clear the 22'setback from debris and construction materials....4) Remove temporary fence... Contractor to complete corrections and to call for inspection when ready. I. Perez | 04/04/2023 10:12 AM |
Confirmation No. | Contractor Not On Site | Description of Work | Work Location | Type of Work | Inspection Date Time | Modified By | Modified On |
---|